Current Projects
General Maintenance / Operations Lay Up – Batam Indonesia | Crude Oil Export Facility Reconstruction Project – SEALINE Iraq |
Client : Leighton Malaysia Sdn. Bhd | Client : Leighton Middle East Dubai Branch |
Main Client : Leighton Asset Operations | Main Client : South Oil Company Iraq |
Project Scope:
General maintenance of the Pipe-lay Barge Stealth, and Faulkner Barge for readiness upcoming projects and class certification
|
Project Scope:
The development of two offshore valve station platforms, a 75 kilo-meter 48” oil pipeline and a Single Point Mooring system.
|
Location : Batam Indonesia | Location : Southern Iraq, Arabian Gulf, Iraq |
GBI Scope of Work :
Supplied HSE Project Management and Project Assignment & Support of Safety Specialist
|
GBI Scope of Work: Supplied HSE Project Management and Project Assignment & Support of Safety Specialist |
Fleet / Barge : Faulkner, PLB Stealth and Onshore | Fleet / Barge : Mynx Barge, Eclipse Barge |
General Maintenance / Operations Lay Up – Sharjah UAE
|
Pipeline Replacement Project 3 – India
Season 2
|
Client : Leighton Malaysia Sdn. Bhd | Client : Leighton Welspun India |
Main Client : Leighton Asset Operations | Main Client : ONGC India |
Location : Hamriya, Azman UAE | Location : Offshore India (Mumbai High) |
Project Scope:
General maintenance of the Pipe-lay Barge Eclipse, Construction Barge Mynx and Cable lay barge MPV 1 for readiness upcoming projects and class certification
|
Project Scope:
Installation of 31 subsea pipeline segments, both rigid and flexible, of various diameters up to 16″ and totaling approximately 200kms in length, as well as associated pipeline risers, platform topsides modifications, hook-up activities and testing.
|
GBI Scope of Work :
Supplied HSE Project Management and Project Assignment & Support of Safety Specialist and Offshore Medic
|
GBI Scope of Work :
Supplied Marine Offshore Safety Specialist
|
Fleet / Barge : PLB Eclipse, Mynx and MPV 1 |
Fleet / Barge : PLB Eclipse
|
Bukom SBM 48” Subsea Pipeline Repair Project, Singapore | Iraq Crude Oil Export Expansion Project Phase (ICOEEP Phase 1), Iraq |
Client : Leighton Offshore Sdn. Bhd | Client : Leighton Middle East LLC |
Main Client : Shell Singapore | Main Client : South Oil Company Iraq |
Location : Offshore Singapore | Location : Offshore Iraq |
Project Scope :
Laying of the 2.7km new pipeline in the re-routed trenched corridor, de-oiling, removal of existing SBM buoy & PLEM, in-situ inspection of mooring chains, de-burial & cutting of existing pipeline at tie-in locations, installation of new PLEM, re-installation of SBM, Hydrotesting & final leak testing of the modified facilities.
|
Project Scope:
Installation of 31 subsea pipeline segments, both rigid and flexible, of various diameters up to 16” and totalling approximately 200kms in length, as well as associated pipeline risers, platform topsides modifications, hook-up activities and testing.
|
GBI Scope of Work :
Supplied HSE Project Management and Project Assignment & Support of Safety Specialist and Offshore Medic
|
GBI Scope of Work :
Supplied HSE Project Management and Project Assignment & Support of Safety Specialist
|
Fleet / Barge : PLB Stealth, DSV Altus Exertus, and Onshore refinery | Fleet / Barge : PLB Eclipse, DSV Providence |
Qatar Gas SPM Repair Phase 1 & 2
|
Pipeline Replacement Project 3 –
Season 1
|
Client : Leighton Middle East Dubai Branch | Client : Leighton Welspun India |
Main Client : Qatar Gas | Main Client : ONGC India |
Location : Offshore Qatar | Location : Offshore India (Mumbai High) |
Project Scope :
Replacement of subsea & floating hoses on the SPM 2 & the Subsea Hoses SPM 1 system which are operated by Qatar Gas
|
Project Scope :
Installation of 31 subsea pipeline segments, both rigid and flexible, of various diameters up to 16″ and totalling approximately 200kms in length, as well as associated pipeline risers, platform topsides modifications, hook-up activities and testing.
|
GBI Scope of Work :
Supplied HSE Project Management and Project Assignment & Support of Safety Specialist and Offshore Medic
|
GBI Scope of Work :
Supplied HSE Project Management and Project Assignment & Support of Safety Specialist
|
Fleet / Barge : PLB Eclipse, DSV Providence, & Barge Millennium 2 | Fleet / Barge : PLB Eclipse & Brownfield Work |
Balongan Pipeline – Main Oil Line Pipeline Project, Indramayu Indonesia
|
Crude Oil Export Facility Reconstruction Project – SEALINE Iraq (Brownfield)
|
Client : Leighton Malaysia Sdn. Bhd | Client : Leighton Middle East Dubai Branch |
Main Client: PT Timas Suplindo (Ultimate Client: PT Pertamina E&P) | Main Client : South Oil Company Iraq |
Location : Offshore Cirebon, Indonesia | Location : Southern Iraq, Arabian Gulf, Iraq |
Project Scope :
Installation Engineering, Transportation and Installation (T&I) of 12” Pipeline in water depth of 35m from landfall to existing platform including burial of pipes, Riser + subsea spool installation at existing platform.Shore pull of 12” diameter pipelines to land fall point Hydrotest and pre-commission from riser to land fall point
|
Project Scope:
Commissioning ABBOT and KAOT Offshore Platform and Platform modification
|
GBI Scope of Work:
Supplied HSE Project Management and Project Assignment & Support of Safety Specialist, Quality Inspector and Offshore Medic
|
GBI Scope of Work:
Supplied HSE Project Management and Project Assignment & Support of Safety Specialist
|
Fleet / Barge : Faulkner, PLB Stealth and Onshore | Fleet / Barge : Mynx Barge, Eclipse Barge |